
Article finder
Filter by:
Refurbishment and Repositioning of 27 Queen Anne’s Gate, Westminster
Situated in a prestigious Westminster location, this project involved the transformation of three outdated office floors within a fully occupied building. The aim was for SHW’s BCD team to reposition the space for the modern market by delivering high-quality, flexible office accommodation ready for immediate re-letting.
3 July 2026
SEE MORESHW - Supporting the evolving needs of the education sector
At SHW, we work closely with clients across the education sector — from independent schools to multi-site educational operators — helping them navigate an increasingly challenging landscape.
3 July 2026
SEE MORECase Study: Defects Survey – Parapet Coping Failure
SHW’s Building Consultancy Department were asked to conduct a defects survey at a modern detached residential property in Claygate Surrey, following reports of loose and unstable stone coping units at parapet wall level. The condition raised concerns regarding safety and potential material failure.
29 June 2026
SEE MOREResidential Property Refurbishment and Defect Resolution in Ewell, Epsom
SHW’s Building Consultancy Department successfully managed a comprehensive residential project in Ewell, Epsom, guiding the process from initial defect analysis through to final handover. Acting on behalf of a private client for whom we provide ongoing residential property management services, our role was both multi-disciplinary and client-focused, ensuring a seamless and high-quality outcome throughout.
29 June 2026
SEE MORESHW - Planned Preventative Maintenance in Epsom Residential Block
This case study relates to a three-storey residential block in Epsom comprising 32 leasehold flats. The building was originally constructed for office use in the 1980s and converted into residential accommodation in 2015. The managing agent, acting on behalf of the freeholder, commissioned a planned maintenance report to support long-term building management which our Building Consultancy Department handled.
17 June 2026
SEE MORESHW Building Consultancy Case Study: 3 Cadogan Square
SHW’s Building Consultancy Team successfully delivered a programme of external repairs, maintenance, and redecoration works at 3 Cadogan Square, Chelsea, London, on behalf of Cadogan Estates Ltd.
15 June 2026
SEE MORESHW Case Study: Façade Remediation Project
A residential building in South West London, required a comprehensive façade remediation scheme to address issues relating to external wall construction and compliance with updated building safety standards. The project formed part of a broader initiative to improve building safety, enhance performance, and restore confidence among residents. A key component of the works involved the removal and replacement of Expanded Polystyrene (EPS) insulation render systems, ensuring the building met current fire safety and performance requirements while also improving durability and aesthetics.
10 June 2026
SEE MORESHW - AI supports valuation. Valuers deliver it
As Artificial Intelligence continues to gain traction within the property sector, one of its most practical applications emerging is the handling of statutory enquiries for valuation reports.
1 June 2026
SEE MOREStructural Repairs to Office Car Park
SHW is acting as contract administrator for structural repair works to a car park at an office building near the M25 in Kent. Our Gatwick Building Consultancy team has supported the project from the initial investigation of the defects through to the start of the works.
22 May 2026
SEE MORE- Page
- 1
- 30













