10 June 2026
SHW Case Study: Façade Remediation Project
Building Consultancy, Development, Planning, Residential
A residential building in South West London, required a comprehensive façade remediation scheme to address issues relating to external wall construction and compliance with updated building safety standards. The project formed part of a broader initiative to improve building safety, enhance performance, and restore confidence among residents. A key component of the works involved the removal and replacement of Expanded Polystyrene (EPS) insulation render systems, ensuring the building met current fire safety and performance requirements while also improving durability and aesthetics.

Project Overview
• Project Name: South West London Residential Block
• Project Value: Approximately £2.4 million
• Scope: Façade remediation scheme, including replacement of Expanded Polystyrene (EPS) insulation rendering

Challenges
The project presented several key challenges:
-
Securing Funding: Accessing financial support through the Building Safety Fund required detailed submissions and close coordination with stakeholders.
-
Stakeholder Coordination: Involvement of multiple parties, including the client, main contractor, and Building Safety Fund representatives.
-
Technical Compliance: Ensuring all replacement materials adhered to current safety regulations and performance standards.
-
Maintaining Aesthetics: Delivering a compliant solution without compromising the building’s visual appeal.
SHW’s Role
The Building Consultancy Department played a central role in the successful delivery of the façade remediation project. Our involvement included:
-
Funding Support
-
Worked closely with the client to prepare and submit the necessary documentation for the Building Safety Fund.
-
Successfully secured full funding for the project, enabling the remediation works to proceed without financial barriers for residents.
-
Stakeholder Collaboration
-
Coordinated closely with the client, main contractor, and government representatives.
-
Ensured clear communication and alignment throughout all project phases.
-
Technical and Material Guidance
-
Collaborated with a range of trusted suppliers to identify suitable replacement systems.
-
Ensured all materials used met current building safety and fire compliance standards.
-
Focused on maintaining a high-quality finish while improving safety and durability.
Solutions Delivered
The façade remediation works included:
-
Full removal of existing EPS insulation render system
-
Installation of a compliant, modern façade system
-
Upgraded insulation and external wall finishes
-
Quality control measures to ensure long-term performance
Particular attention was paid to achieving a balance between safety, performance, and visual quality, ensuring the building not only met regulations but also enhanced its overall appearance.
Results
The successful completion of the project delivered:
-
Full compliance with updated building safety regulations
-
Improved fire safety and thermal performance
-
Enhanced building aesthetics
-
No financial burden on leaseholders due to secured funding
-
Strengthened stakeholder confidence

Conclusion
This façade remediation project highlights SHW’s Building Consultancy Departments ability to manage complex building safety schemes from funding acquisition through to delivery. By combining technical expertise, strong stakeholder collaboration, and a focus on quality, SHW ensured the successful transformation of the building into a safe, compliant, and visually improved asset.